County | RTP ID |
Project Title | Total Capital Cost |
Proposed Funding Percentage |
Comments |
---|---|---|---|---|---|
Santa Clara | 20001 | US 101/Bailey Avenue interchange improvements | $45.00 | 0% | |
Bay Area Region | 21012 | Golden Gate Bridge Seismic Retrofit (completes Phases 2 and 3) | $392.00 | 100% | |
Sonoma | 21070 | Realign Route 116 (Stage Gulch Road) along Champlin Creek and widen the remaining segments | $37.72 | 0% | |
Solano | 21072 | Widen SR12 between Suisun City and Rio Vista | $14.00 | 0% | |
Solano | 21072 | Operational and Safety Improvements SR12 between Suisun City and Rio Vista | $36.00 | 100% | |
Alameda | 21100 | Vasco Road/I-580 Interchange Improvements | $40.00 | 0% | |
Alameda | 21133 | New West Dublin/Pleasanton BART Station | $53.00 | 100% | Wasn't this was supposed to be a privately paid for station? Jones Lang LaSalle? |
Contra Costa | 21208 | "Richmond Parkway Transit Center: includes signal reconfiguration/timing, new 700-800 space parking facility, and security improvements at Hilltop park-and-ride lot" | $24.70 | 100% | Should Hilltop and Richmond Parkway projects be separated? |
Contra Costa | 21212 | Widen eastbound Hillcrest Avenue offramp from 1 lane to 2 lanes and add a Route 4 eastbound auxiliary lane in Antioch | $2.50 | 100% | |
Contra Costa | 21213 | Pittsburg/Bay Point BART Station parking & lighting improvements (400 new spaces) | $4.00 | 0% | |
Contra Costa | 21214 | Widen Wilbur Avenue from 2 lanes to 4 lanes over Burlington Northern Santa Fe Railroad | $8.50 | 100% | |
Contra Costa | 21216 | Extend Laurel Road from Route 4 Bypass to Empire | $20.00 | 0% | |
Bay Area Region | 21320 | Golden Gate Bridge Moveable Median Barrier | $23.80 | 100% | |
Marin | 21325 | US101 Greenbrae interchange | $47.40 | 0% | |
Solano | 21341 | Project development for new Fairfield/Vacaville multi-modal rail station for Capitol Corridor intercity rail service in Solano County (Phase One) | $30.00 | 100% | Station site should be different |
Sonoma | 21346 | S 101/Route 116 separation: improve Route 116 onramp to southbound US 101 | $2.00 | 100% | |
Solano | 21348 | Install a second span along existing Green Valley Bridge to facilitate four lanes of travel way and an acceleration/deceleration lane in each direction | $16.80 | 100% | |
San Mateo | 21349 | US 101/Ralston Avenue interchange improvement | $14.40 | 100% | |
Alameda | 21417 | Dumbarton Express park-and-ride: 90 spaces on Decoto Road near I-880 by the Dumbarton Bridge (includes right-of-way acquisition) | $1.50 | 0% | |
Alameda | 21451 | East 14th Street/Hesperian Boulevard/150th Street channelization improvements | $1.80 | 100% | |
Alameda | 21455 | "Widen I-238 from 4 lanes to 6 lanes between I-580 and I-880, includes auxiliary lanes on I-880 south of I-238" | $108.00 | 100% | |
Alameda | 21456 | I-580 Auxiliary Lanes between Santa Rita Road/Tassajara Road and Airway Boulevard Interchanges. | $11.90 | 100% | |
Alameda | 21460 | "Iron Horse bicycle, pedestrian and transit route" | $5.80 | 100% | |
Alameda | 21464 | "Paratransit for AC Transit, BART, non-mandated city programs, service gap coordination" | $243.00 | 100% | |
Alameda | 21465 | Transit enhancements funded by transit center development funds | $4.40 | 100% | |
Alameda | 21466 | Washington Avenue/Beatrice Street interchange improvements | $1.41 | 100% | |
Alameda | 21467 | New arterial along eastern edge of Westgate Shopping Center between Davis Street and Williams Street | $10.63 | 100% | |
Alameda | 21468 | "Transit operations - AC Transit, Welfare to Work, Alameda ferries, Altamont Commuter Express (ACE), Union City Transit, Livermore Amador Valley Transit Authority (LAVTA), and countywide express bus" | $510.00 | 100% | |
Alameda | 21470 | I-680/Sunol Boulevard ramp improvements; includes signal improvements and widening under existing structure | $0.90 | 100% | |
Alameda | 21472 | I-680/Bernal Avenue interchange improvements | $17.50 | 0% | |
Alameda | 21473 | North Canyons Parkway-Dublin Boulevard Gap Closure | $10.00 | 0% | |
Alameda | 21475 | First Street/I-580 Interchange Improvements | $30.00 | 0% | Duplicate of 22798 |
Alameda | 21477 | Greenville Road/I-580 Interchange Improvements | $35.00 | 0% | |
Alameda | 21480 | Route 84/Ardenwood Boulevard westbound offramp intersection improvements | $0.60 | 100% | |
Alameda | 21482 | Exend Fremont Boulevard to connect to I-880/Dixon Landing Road | $4.50 | 100% | |
Alameda | 21483 | Widen Stevenson Boulevard from 4 lanes to 6 lanes from I-880 to Blacow Road | $1.00 | 100% | |
Alameda | 21484 | Widen Kato Road from Warren Avenue to Milmont Drive | $3.00 | 100% | |
Alameda | 21486 | Paseo Padre Parkway/Peralta Boulevard (Route 84) intersection improvements | $0.50 | 100% | |
Alameda | 21487 | Widen Mowry Avenue from Mission Boulevard to Peralta Boulevard | $0.50 | 100% | |
Alameda | 21488 | Warren Avenue/Warm Springs Boulevard intersection improvements | $0.50 | 100% | |
Alameda | 21489 | I-580/San Ramon Road/Foothill Road interchange improvements | $3.90 | 0% | |
Alameda | 21492 | Extend Scarlett Drive from Dublin Boulevard to Dougherty Road | $5.80 | 0% | |
Alameda | 21493 | I-580/I-680 Transportation Operations System (TOS) | $4.41 | 100% | |
San Francisco | 21503 | Traffic Calming (sales tax project) | $142.00 | 100% | |
San Francisco | 21507 | Other Transit Enhancements (sales tax project) | $160.00 | 100% | |
San Francisco | 21533 | Street Tree Program | $95.00 | 100% | |
San Francisco | 21549 | "Bayview Transportation Improvements Project (EIS, design, R/W)" | $12.70 | 100% | |
Santa Clara | 21558 | Foothill Expressway Operational Corridor improvements between Edith and El Monte & at Grant/St. Joseph Intersection | $1.50 | 0% | |
San Mateo | 21605 | US 101/Oyster Point Boulevard interchange improvements (Phases 2 and 3) | $40.00 | 100% | 100% if under construction; 0% if not |
San Mateo | 21606 | US 101/ Willow Road interchange reconstruction | $49.50 | 0% | |
San Mateo | 21607 | US 101/University Avenue interchange reconstruction | $4.90 | 100% | |
San Mateo | 21608 | US 101 auxiliary lanes from Marsh Road to Santa Clara County line | $91.20 | 0% | |
San Mateo | 21617 | Caltrain Express service between San Francisco and San Jose; includes passing tracks and rolling stock (Phase 1) | $128.10 | 100% | |
San Mateo | 21623 | Additional Caltrain local station improvements in San Mateo County | $37.86 | 100% | |
San Mateo | 21626 | Caltrain Grade Separation Program (San Mateo County) | $84.29 | 100% | |
San Mateo | 21630 | Continuation of SamTrans express service | $3.00 | 100% | |
Santa Clara | 21703 | I-880/Coleman Avenue interchange improvements | $70.00 | 100% | (Under construction) |
Santa Clara | 21715 | SR 152/SR 156 Interchange Improvements | $27.25 | 100% | |
Santa Clara | 21729 | Mary Avenue bicycle and pedestrian overcrossing at I-280 | $6.80 | 100% | |
Santa Clara | 21730 | Los Gatos Creek Trail from Lincoln Avenue to Auzerais | $2.00 | 100% | |
Santa Clara | 21731 | Los Gatos Creek Trail from San Fernando Street to San Carlos Street | $3.00 | 100% | |
Santa Clara | 21733 | Uvas Creek Class 1 Trail connection to Gilroy Sports Park (Phases 1 and 2 from Thomas Road Bridge to Gilroy Sports Park) | $0.47 | 100% | |
Santa Clara | 21735 | San Tomas Aquino Creel Trail (Hwy 237 to City limits) | ?? | 100% | |
Santa Clara | 21737 | Borregas Avenue bicycle and pedestrian overcrossings at US 101 and Route 237 | $7.40 | 100% | |
Santa Clara | 21738 | West Little Llagas Creek bicycle and pedestrian pathway from Spring Road to Watsonville Road | $1.50 | 100% | |
Santa Clara | 21739 | Union Pacific bicycle and pedestrian overcrossing from Gibraltar Court to Montague Expressway | $3.00 | 100% | |
Santa Clara | 21741 | Bike and pedestrian improvements on Hamilton Avenue from Salmar to Creekside (Route 17) | $1.50 | 100% | |
Santa Clara | 21742 | River Oaks Parkway bike and pedestrian bridge at Guadalupe River | $2.60 | 100% | |
Santa Clara | 21743 | Bicycle improvements on Almaden Expressway between Ironwood Drive and Foxworthy | $2.00 | 100% | |
Santa Clara | 21745 | De Anza Trail (Reach 3) | $2.50 | 100% | |
Santa Clara | 21746 | Cox Avenue/Southern Pacific railroad intersection improvements; includes improvements to grade crossings and bicycle paths | $0.50 | 100% | |
Santa Clara | 21750 | VTA Landscape Restoration and Graffiti Removal Program | ?? | 100% | |
Santa Clara | 21760 | Double track Caltrain between San Jose and Gilroy | $0.10 | 100% | |
Santa Clara | 21768 | Caltrain local station improvements | $110.00 | 100% | |
Santa Clara | 21786 | US 101/Hellyer Avenue interchange modifications | $11.00 | 0% | |
Santa Clara | 21787 | Palo Alto Intermodal Transit Center (Phase I) | $50.00 | 100% | |
Santa Clara | 21790 | Altamont Commuter Express Upgrade | $46.00 | 0% | CHSRA |
Santa Clara | 21794 | Bus Rapid Transit Corridor: El Camino Real (Line 22): Phase I & II | $6.50 | 100% | |
Santa Clara | 21797 | Route 17 bus service improvements | $1.00 | 100% | |
Santa Clara | 21831 | Montague Expressway level-of-service improvements: US 101 to North First St. | $8.61 | 0% | |
Santa Clara | 21832 | Central Expressway level-of-service improvements: Bowers Avenue to De la Cruz Boulevard | $5.22 | 0% | |
Santa Clara | 21833 | Almaden Expressway level-of-service improvements: Blossom Hill Road to Branham Lane | $4.06 | 0% | |
Santa Clara | 21837 | Capitol Expressway level-of-service improvements at McLaughlin Avenue | $0.50 | 0% | |
Santa Clara | 21838 | Foothill Expressway level-of-service improvements at various locations | $2.00 | 0% | |
Santa Clara | 21860 | Non-pavement maintenance (sidewalk, lighting, drainage, landscaping, etc. - committed revenues shown) | $1494.50 | 100% | |
Santa Clara | 21868 | Local bridge maintenance | $99.10 | 100% | |
Alameda | 21886 | Industrial Parkway upgrade between Whipple Road and improved segment of the parkway in Hayward | $0.50 | 100% | |
Marin | 21888 | Redwood landfill overcrossing | $6.90 | 100% | |
Alameda | 21896 | Route 84 vertical and horizontal alignment improvements in Fremont and San Leandro (3 miles to 5.1 miles east of I-680) | $28.40 | 0% | 84 goes nowhere near San Leandro -- what is this? Pigeon Pass is a bad ie 0% project |
Santa Clara | 21921 | BART extension into Santa Clara County | $839.50 | 0% | |
Santa Clara | 21922 | San Jose International Airport connections to Guadalupe LRT | $512.00 | 0% | |
Santa Clara | 21923 | "Bus Rapid Transit corridor: Stevens Creek Boulevard,El Camino Phase IIIB & Monterey Hwy." | $46.00 | 100% | |
Alameda | 21992 | AC Transit bus corridor improvements | $20.00 | 100% | |
Sonoma | 21998 | Rehabilitate and widen Route 116 between Elphick Road to Redwood Drive in Sebastopol and Cotati | $34.48 | 50% | Rehabilitate, add left turn lanes, no other widening |
San Francisco | 22000 | Downtown Ferry Terminals (sales tax project) | $105.70 | 50% | |
Marin | 22146 | Cal Park Hill Tunnel Rehabilitation and Class 1 Bikeway. | $12.50 | 100% | |
San Francisco | 22248 | Curb Ramps | $175.00 | 100% | |
San Francisco | 22249 | New and Upgraded Streets (sales tax programmatic category) | $24.13 | 100% | |
San Francisco | 22255 | Ilinois Street Intermodal Bridge | $22.45 | 100% | |
Contra Costa | 22353 | I-680 SB HOV Gap Closure Between N. Main and Livorna | $14.00 | 0% | |
San Francisco | 22412 | Expansion LRVs | $45.00 | 100% | Delete if expansion LRVs are only for deleted New Central Subway |
San Francisco | 22415 | Historic Streetcar Service (sales tax project) | $142.55 | 100% | |
San Francisco | 22420 | Bus Rapid Transit/Transit Preferential Streets (sales tax project) | $600.00 | 100% | |
San Francisco | 22514 | SFgo (Integrated Traffic Management System) (Prop K funded program) | $19.60 | 100% | |
Bay Area Region | 22520 | BART Seismic Retrofit Program | $1307.00 | 100% | |
Contra Costa | 22600 | Widen Somersville Road Bridge in Antioch to 4 lane | $1.00 | 100% | |
Contra Costa | 22601 | "SR 4 Bypass: Segment 3: Construct a 2-lane facility from Balfour Rd to Walnut Blvd, and upgrade Marsh Creek Rd." | $47.00 | 0% | |
Solano | 22623 | Nut Tree interchange - widening | $10.00 | 100% | |
Solano | 22624 | Benicia Intermodal Transportation Station | $16.40 | 100% | See alternate station location on transit map submittal |
Solano | 22624 | I-80 Reliever Route: Jepson Parkway Project | $30.00 | 0% | |
Solano | 22625 | Broadway Widening: Highway 37 to Mini Drive | $4.86 | 100% | |
Solano | 22625 | North Texas St. restoration - Phase 1 & 2 | $14.00 | 100% | |
Solano | 22626 | Routes 29/37 Interchange | $62.00 | 100% | (Under construction) |
Solano | 22628 | Wilson Ave. Improvements Project: Ph II | $16.46 | 100% | |
Solano | 22629 | Vallejo Ferry Terminal Intermodal Facility | $52.00 | 0% | Delete this parking garage -- see alternate ferry terminal relocation project |
Solano | 22630 | Parkway Blvd/UPRR Grade Separation | $9.46 | 100% | |
Solano | 22631 | Red Top Road Truck Climbing Lane | $10.16 | 0% | |
Solano | 22632 | American Canyon Road overpass expansion | $8.24 | 0% | |
Solano | 22633 | Mare Island - Azuar Drive Improvements | $9.00 | 100% | |
Solano | 22638 | Capitol Corridor Benicia Siding Extension on I-80 and I-680 Corridor | $10.00 | 100% | |
Santa Clara | 22650 | Capitol Expressway Light Rail Corridor | $76.00 | 0% | |
Sonoma | 22652 | Rehabilitate Highway 101 from Steele Lane to Grant overhead | $14.50 | 100% | |
Sonoma | 22655 | "Highway 101 HOV Lanes and Ramp Metering and I/C Improvement, Rohnert Park Expressway to Santa Rosa Avenue" | $39.40 | 0% | |
Sonoma | 22656 | US 101/East Washington Interchange: add new NB on ramp and lengthen existing 3 on-ramps | $11.00 | 100% | |
Santa Clara | 22662 | Capitol Expressway Light Rail Corridor | $76.00 | 0% | |
Bay Area Region | 22674 | BART Core Capacity Program - System Capacity. Project takes the place of CC 212101 because it is systemwide. | $230.00 | 100% | |
Bay Area Region | 22675 | BART Core Capacity Program - Access | $760.00 | 33% | |
Bay Area Region | 22676 | BART Core Capacity Program - Station Capacity | $625.00 | 100% | |
Alameda | 22784 | First Street Improvements | $10.00 | 100% | |
Alameda | 22796 | North Canyons Parkway-Dublin Boulevard Gap Closure | $10.00 | 0% | |
Alameda | 22797 | Greenville Road/I-580 Interchange Improvements | $35.00 | 0% | |
Alameda | 22798 | First Street/I-580 Interchange Improvements | $30.00 | 0% | |
Alameda | 22799 | Vasco Road/I-580 Interchange Improvements | $40.00 | 0% | |
Santa Clara | 22801 | Bernardo Ave. Undercrossing at Caltrain Tracks | $5.00 | 100% | |
Santa Clara | 22802 | Hetch Hetchy Pathway | $0.44 | 100% | |
Santa Clara | 22803 | Pilot Bike Parking rack project | $0.20 | 100% | |
Santa Clara | 22804 | Stevens Creek Trail Feasibility Study | $0.08 | 100% | |
Santa Clara | 22902 | Future Rail Corridors | $184.00 | 0% | |
Santa Clara | 22977 | Santa Clara/Alum Rock Corridor preliminary engineering and right of way purchase | $28.00 | 0% | |
Santa Clara | 22978 | Capitol Expressway Light Rail Corridor | $76.00 | 0% | |
Alameda | 94024 | Auto/truck separation lane at I-580/I-205 interchange | $15.70 | 0% | |
Alameda | 94030 | Reconstruct I-880/Route 262 interchange and widen I-880 from Route 262 (Mission Boulevard) to the Santa Clara County line from 8 lanes to 10 lanes (8 mixed-flow and 2 HOV lanes) | $162.60 | 0% | |
Contra Costa | 94047 | Extend I-80 westbound HOV lane from north of Cummings Skyway to State Route 4 | $30.00 | 0% | |
Contra Costa | 94051 | I-680 Auxiliary lane from Diablo Road to Sycamore Valley Road (Segment 1) in Danville and from Crow Canyon Road to Boliinger Canyon Road (Segment 3) in San Ramon. | $22.50 | 0% | |
Contra Costa | 94052 | I-680 HOV lanes from Marina Vista interchange to North Main Street (southbound) and from SR 242 northbound to the Marina Vista interchange | $54.50 | 0% | |
Contra Costa | 94054 | "Martinez Intermodal Terminal Facility (Phases 1 and 2); includes construction of a new passenger rail station, bus facilities and parking" | $31.30 | 100% | |
Napa | 94070 | Transit Service Center in the city of Napa and operational improvements for existing transit programs | $2.04 | 100% | |
Napa | 94071 | Replace Napa River (Maxwell) Bridge and widen from 2 lanes to 4 lanes on Route 121 over the Napa River in the city of Napa | $29.00 | 100% | (Under construction) |
Napa | 94076 | Trancas Intermodal facility in the city of Napa | $0.76 | 100% | |
San Francisco | 94090 | Bicycle and Pedestrian Projects | $127.10 | 100% | |
San Mateo | 94100 | US 101 auxiliary lanes from Marsh Road to Route 92 | $59.90 | 0% | |
Santa Clara | 94117 | Transit centers and park-and-ride lots | $13.90 | 100% | |
Solano | 94150 | I-80/I-680/Route 12 interchange improvements; includes connectors and auxiliary lanes between Green Valley Road and Cordelia truck weigh station (Phase 1) | $18.60 | 100% | |
Sonoma | 94165 | US 101 northbound and southbound HOV lanes from Route 12 to Steele Lane in Santa Rosa | $48.83 | 0% | |
Sonoma | 94167 | Sonoma-Marin Rail station site acquisitions/upgrades | $5.00 | 100% | |
Alameda | 94504 | Oakland Airport: construct 4-lane cross-airport roadway (mostly on Port of Oakland property) | $114.74 | 100% | |
Alameda | 94506 | Route 84 Realignment in Fremont and Union City | $118.20 | 0% | |
Alameda | 94507 | Route 238 (Hayward) Bypass Stage 1 | $150.00 | 0% | Sherman will define alternate project. |
Alameda | 94514 | I880/Route 92 Interchange Improvements in Hayward | $134.20 | 0% | Sherman will create substitute project -- widen overpass |
Alameda | 94515 | I-580 connections to Hayward Bypass (Route 238) and interchange improvements: northbound Hayward Bypass to northbound I-580 and northbound Hayward Bypass to westbound I-238 | $22.61 | 0% | |
Contra Costa | 94531 | Widen Route 4 to 6 mixed flow lanes and 2 HOV lanes from Bailey Road to Railroad Avenue and restripe from Route 242 to Bailey Avenue for HOV lanes | $27.96 | 100% | (Under construction) |
Contra Costa | 94532 | Gateway Lamorinda traffic program | $14.80 | 100% | |
Contra Costa | 94538 | Route 4 transportation management system | $0.68 | 100% | |
Contra Costa | 94555 | "Capitol Corridor intercity rail service (12 round trips daily between Oakland and Sacramento, and 4 round trips daily between San Jose and Oakland)" | $66.00 | 100% | The cost per passenger is excessive |
Marin | 94563 | Marin Hwy 101 HOV lanes both direction from Lucky | $128.50 | 0% | Under construction? (100% if so). |
Napa | 94575 | Route 29: Redwood/Trancas Road interchange construction | $53.00 | 100% | (Under construction) |
Santa Clara | 94609 | Local streets and roads pavement maintenance (committed revenues shown) | $972.00 | 100% | |
Santa Clara | 94610 | "VTA - transit operating and capital improvement program (including replacement, rehabilitation, and minor enhancements for rolling stock, equipment, fixed facilities and other capital assets. Does not include system expansion). | $10743.50 | 100% | |
Santa Clara | 94613 | Caltrain (Santa Clara County portion) transit operating and capital improvement program (including replacement, rehabilitation, and minor enhancements for rolling stock, equipment, fixed facilities and other capital assets; does not include system expansion | $799.50 | 100% | |
Santa Clara | 94617 | Capitol Corridor intercity rail service (9 round trips daily between Oakland and Sacramento and 7 round trips daily between San Jose and Oakland) | $66.00 | 100% | |
San Francisco | 94624 | Traffic signals and signs | $225.00 | 100% | |
San Francisco | 94625 | Bernal Heights Street System Upgrading | $7.00 | 100% | |
San Francisco | 94632 | Third Street Light Rail Project - Phase (light rail transit extension to Bayview Hunters Point--initial operating segment) | $583.91 | 100% | |
San Francisco | 94637 | Paratransit | $291.00 | 100% | |
San Francisco | 94639 | "TDM, Ridesharing and transit promotion" | $5.97 | 100% | |
San Mateo | 94643 | Widen Route 92 between Route 1 and Half Moon Bay city limits | $13.90 | 100% | |
San Mateo | 94656 | Devils Slide Bypass | $280.00 | 100% | |
Solano | 94675 | "Route 37 from Napa River Bridge to Route 29: upgrade from 2-lane expressway to 4-lane freeway (not including Routes 29/37 interchange), planting, and environmental mitigation" | $58.20 | 100% | (Under construction) |
Sonoma | 94689 | US 101/Arata Lane interchange improvements in Windsor (Phase 2) | $2.50 | 100% | |
Alameda | AN | Route 238 (Hayward) Bypass Stage 1 | $146.30 | 0% | Duplicate of RTPID 94507 |
Sonoma | 94691 | Route 121 traffic signal system and channelization at 8th Street | $0.40 | 100% | |
Santa Clara | 96002 | Route 152 safety improvements from Uvas Creek to Route 156 near Gilroy | $21.07 | 100% | |
Contra Costa | 96022 | "Route 4 Bypass, Segment 1: construct a 6-lane facility from Route 4 to Laurel Road and a 4-lane facility from Laurel Road Interchange to Lone Tree Way, and add interchanges at Laurel Road and Lone Tree Way" | $85.00 | 0% | |
San Francisco | 98102 | South Access to the Golden Gate Bridge: Doyle Drive environmental study | $16.20 | 100% | |
Contra Costa | 98104 | "Widen State Route 4, Railroad Avenue to Loveridge: interchange improvements and highway widening to 6 mixed flow lanes and 2 HOV lanes." | $100.00 | 0% | |
Contra Costa | 98115 | Widen Ygnacio Valley/Kirker Pass Roads from 4 lanes to 6 lanes from Michigan Boulevard to Cowell Road | $6.03 | 0% | |
Santa Clara | 98119 | Vasona Corridor light rail extension from downtown San Jose to Winchester Boulevard in Campbell | $320.40 | 100% | |
Santa Clara | 98121 | "Increase Caltrain service from San Jose to Gilroy, includes Caltrain corridor facilities and service improvements" | $136.70 | 33% | |
Contra Costa | 98127 | I-680/Alcosta Boulevard interchange improvements | $14.80 | 0% | |
Contra Costa | 98132 | Widen and extend Bollinger Canyon Road (6 lanes) from Alcosta Boulevard to Dougherty Road | $4.40 | 0% | |
Contra Costa | 98134 | Widen Dougherty Road to 6 lanes from Red Willow to Contra Costa County line | $45.00 | 0% | |
Contra Costa | 98135 | Construct Windermere Parkway: 4 lanes from Bollinger Canyon Road extension to East Branch | $14.00 | 0% | |
Contra Costa | 98136 | Construct East Branch: 4 lanes from Bollinger Canyon Road extension to Camino Tassajara | $14.00 | 0% | |
Santa Clara | 98140 | "I-680 Sunol Grade southbound and northbound HOV lanes, ramp metering and auxiliary lane from Route 84 to Route 237 (possible value pricing project)" | $22.00 | 0% | |
Contra Costa | 98142 | Widen Route 4 from 4 lanes to 8 lanes from Loveridge Road to Somersville Road with HOV lanes | $70.00 | 0% | |
Alameda | 98153 | Reconstruct MacArthur Boulevard on ramp to restore access to eastbound I-80 and westbound I-580 | $9.20 | 100% | |
San Mateo | 98176 | US 101 auxiliary lanes from 3rd Avenue to Millbrae and US 101/Peninsula Avenue interchange reconstruction | $81.70 | 0% | |
Marin | 98178 | US 101/Sir Francis Drake Blvd Improvements. | $0.45 | 100% | |
Contra Costa | 98193 | Extend Panoramic Drive from North Concord BART station to Willow Pass Road | $10.00 | 100% | |
Contra Costa | 98197 | Richmond intermodal transfer station (Station Building) | $4.10 | 100% | |
San Mateo | 98204 | Construct Route 1 northbound and southbound lanes from Fassler Avenue to Westport Drive in Pacifica | $15.50 | 100% | |
Contra Costa | 98211 | I-80 eastbound HOV lane extension from Route 4 to the Crockett interchange just south of the Carquinez Bridge | $50.00 | 0% | |
Sonoma | 98213 | Bike and pedestrian projects | $15.70 | 100% | |
Contra Costa | 98221 | "Route 4 Bypass, Segment 2, Phase2: widen to 4 lanes from Lone Tree Way to Balfour Road" | $12.00 | 0% | |
San Francisco | 98593 | SFgo Initial Phase (Integrated Transportation Management System) | $6.88 | 100% | |
San Francisco | 98630 | BART Advanced Automatic Train Control System (county share) | $53.00 | 100% | This is another scam. |
Alameda | AN | Route 238 (Hayward) Bypass Stage 1 | $146.30 | 0% | Duplicate of RTPID 94507 |