County | RTP ID |
Project Title | Total Capital Cost |
Track One Funds |
ITIP Funds |
Big Tent Funds |
Proposed Funding Percentage |
Comments |
---|---|---|---|---|---|---|---|---|
Santa Clara | 20002 | SR 85 Noise Mitigation between I-280 and SR 87 | $7.00 | $7.00 | $0.00 | $0.00 | 0% | Doesn't this freeway already have sound walls; what is this? |
Alameda | 21033 | I-580 Eastbound Truck Climbing Lane | $65.00 | $0.00 | $65.00 | $0.00 | 0% | |
Solano | 21033 | I-80-Widen 6F to 8F-west of Meridian Rd. to west of Kidwell Rd. | $60.00 | $0.00 | $51.00 | $0.00 | 0% | |
Alameda | 21085 | Alameda County TOS & Ramp Metering on I-580 from the SJ Co. line to the City of Dublin. | $8.80 | $0.80 | $0.00 | $0.00 | 100% | |
Alameda | 21101 | Tinker Avenue Extensions: Webster to 5th (includes Transit Center at College of Alameda) | $14.80 | $2.20 | $0.00 | $0.00 | 100% | |
Alameda | 21103 | Central Avenue Railroad Overpass | $11.70 | $8.60 | $0.00 | $0.00 | 100% | |
Alameda | 21107 | 42nd Avenue & High Street Access Improvements to I-880 | $15.93 | $11.00 | $0.00 | $0.00 | 100% | Traffic safety, seismic program; not capacity |
Alameda | 21112 | Crow Canyon Safety Improvements Project-Stage I | $5.10 | $4.10 | $0.00 | $0.00 | 100% | |
Alameda | 21116 | I-580 Widening for EB and WB HOV and Auxiliary Lanes - Tassajara to Greenville | $197.00 | $37.30 | $41.00 | $0.00 | 0% | |
Alameda | 21123 | Union City Intermodal Station, Phase 2 Passenger Rail Project | $50.00 | $8.00 | $0.00 | $0.00 | 0% | CHSRA in Fremont instead |
Alameda | 21131 | BART-Oakland International Airport connector | $254.30 | $44.00 | $0.00 | $0.00 | 0% | BRT substitute project should be paid for by port |
Alameda | 21132 | BART extension to Warm Springs | $634.00 | $57.70 | 0% | |||
Alameda | 21134 | Bus Rapid Transit in the San Pablo Corridor | $2.00 | $2.00 | $0.00 | $0.00 | 100% | |
Alameda | 21138 | San Leandro BART Station Transit Village (Phase 1); includes parking structure, kiss-and-ride and bus circulation improvements | $29.00 | $2.80 | $0.00 | 50% | need info. No $ for parking; bus OK | |
Alameda | 21139 | Vasco Road Safety Improvements Project | $19.25 | $3.20 | $0.00 | $0.00 | 50% | 0% need K rail in some median locations, ramp metering, not widening |
Alameda | 21145 | Corridor Management Program: signal interconnect, transit priority, SMART corridors, and other improvements | $20.00 | $20.00 | $0.00 | $0.00 | 100% | |
Alameda | 21149 | Express Bus/Dumbarton Corridor Improvements | $4.00 | $1.60 | $0.00 | $0.00 | 0% | |
Alameda | 21151 | LAVTA maintenance/operations facility | $19.80 | $3.20 | $0.00 | $0.00 | 100% | |
Alameda | 21157 | I-80/Ashby-Shellmound interchange modifications | $2.80 | $2.50 | $0.00 | $0.00 | 100% | |
Alameda | 21159 | AC Transit facilities expansion--Northern Alameda County | $2.00 | $2.00 | $0.00 | $0.00 | 100% | |
Alameda | 21185 | Eden Road extension | $2.00 | $1.00 | $0.00 | $0.00 | 100% | |
Contra Costa | 21201 | BART system operations and capacity improvements for Eastshore North, Diablo, and Delta corridors | $19.40 | $19.40 | 0% | Included in BART regional system capacity | ||
Contra Costa | 21202 | Bicycle and pedestrian projects | $22.80 | $19.30 | $0.00 | $0.00 | 100% | |
Contra Costa | 21203 | Express bus acquisition for commuter bus service | $6.80 | $6.80 | $0.00 | $0.00 | 100% | |
Contra Costa | 21204 | Ancillary park and ride, transit access, express bus enhancements - capital facilities | $6.80 | $6.80 | $0.00 | $0.00 | 100% | |
Contra Costa | 21205 | I-680/Route 4 interchange freeway-to-freeway direct connectors (Phases 1 and 2): eastbound Route 4 to southbound I-680, and northbound I- 680 to westbound Route 4 | $112.00 | $106.50 | $0.00 | $0.00 | 0% | |
Contra Costa | 21206 | Caldecott Tunnel fourth bore | $218.00 | $28.00 | $100.00 | $0.00 | 0% | |
Contra Costa | 21207 | Martinez Intermodal Terminal Facility (Phase 3 initial segment): 200 interim parking spaces (includes site acquisition, demolition and construction) | $6.80 | $4.80 | $0.00 | $0.00 | 0% | |
Contra Costa | 21209 | Hercules Transit Center relocation and expansion | $6.80 | $2.80 | $0.00 | $0.00 | 100% | |
Contra Costa | 21210 | Capitol Corridor train station in Hercules | $13.00 | $7.00 | $0.00 | $0.00 | 100% | |
Contra Costa | 21211 | BART/East Contra Costa Rail Extension (Right-of-way acquisition and station construction) | $204.30 | $13.30 | $0.00 | $173.00 | 100% | Assumes this is DMU or BRT |
Marin | 21302 | Bicycle and pedestrian projects (from Countywide Master Plan) | $7.00 | $7.00 | $0.00 | $71.04 | 100% | |
Marin | 21303 | Local Marin bus service enhancements (capital only) | $6.80 | $6.80 | $0.00 | 100% | ||
Marin | 21306 | US 101/Lucas ValleyRoad interchange improvements | $4.65 | $4.65 | $0.00 | $0.00 | 0% | |
Marin | 21308 | Expand Manzanita park-and-ride lot (consists of parking visitor intercept and transit system to provide non auto access to south western Marin Park Lands) | $10.10 | $1.50 | $5.00 | $0.00 | 100% | |
San Francisco | 21342 | Caltrain Downtown Extension/TransBay Terminal Replacement | $1817.20 | $201.30 | 100% | |||
San Francisco | 21501 | Bicycle projects and programs | $4.00 | $2.00 | $0.00 | $2.00 | 100% | |
San Francisco | 21502 | Pedestrian projects and programs | $4.00 | $2.00 | $0.00 | $2.00 | 100% | |
San Francisco | 21503 | Traffic calming | $14.00 | $4.00 | $0.00 | $10.00 | 100% | |
San Francisco | 21504 | Traffic signals and signs | $63.00 | $8.00 | $0.00 | $55.00 | 100% | |
San Francisco | 21505 | Local bridge seismic work | $8.00 | $4.00 | $0.00 | $4.00 | 100% | |
San Francisco | 21506 | Advanced Technology and Information Systems (SFgo) | $58.00 | $8.00 | $0.00 | $50.00 | 100% | |
San Francisco | 21507 | Transit Enhancements | $53.00 | $8.00 | $45.00 | 100% | ||
San Francisco | 21508 | Bus Rapid Transit/Transit Preferential Streets Program | $130.00 | $20.00 | $0.00 | $110.00 | 100% | |
San Francisco | 21510 | Third Street Light Rail Transit, Phase 2 Extension to Chinatown (Central Subway) | $694.00 | $541.67 | $0.00 | $0.00 | 0% | |
San Francisco | 21526 | Transit rehabilitation and replacement | $73.00 | $8.00 | $0.00 | $65.00 | 100% | |
San Francisco | 21529 | New and Upgraded Streets | $38.00 | $8.00 | $0.00 | $30.00 | 100% | |
San Francisco | 21535 | TDM/Transportation Land Use Coordination | $4.00 | $2.00 | $2.00 | 100% | ||
San Francisco | 21548 | Non-MTS streets and roads pavement rehabilitation shortfall | $23.00 | $8.00 | $0.00 | $15.00 | 100% | |
San Mateo | 21602 | US 101/Broadway interchange reconstruction | $56.00 | $56.00 | $0.00 | $0.00 | 100% | Retain only if Broadway Caltrain grade separation included |
San Mateo | 21603 | US 101/Woodside Road interchange improvements | $50.00 | $50.00 | $0.00 | $0.00 | 0% | |
San Mateo | 21612 | Improvement of Dumbarton Bridge Access to US 101 - Phase 1 | $35.00 | $20.00 | $15.00 | $0.00 | 100% | Must include pedestrian safety improvements |
San Mateo | 21613 | Study of Route 92 improvements from San Mateo Bridge to I-280, includes uphill passing lane from US 101 to I-280. | $13.00 | $13.00 | $0.00 | $0.00 | 0% | Michael loses under strong protest |
San Mateo | 21615 | I-280/Route 1 Interchange Safety Improvements | $7.00 | $7.00 | $0.00 | 0% | ||
San Mateo | 21618 | Dumbarton Rail Corridor Phase One | $300.00 | $14.30 | $24.00 | $15.60 | 0% | CHSRA |
San Mateo | 21619 | Caltrain express tracks (Phase 2) (San Mateo County share) | $390.53 | $33.86 | $0.00 | $198.67 | 100% | |
San Mateo | 21624 | Transit-Oriented Development Incentives Program | $30.00 | $30.00 | $0.00 | $0.00 | 100% | |
San Francisco | 21627 | Caltrain electrification from San Francisco to Gilroy | $614.00 | $103.00 | $69.00 | $0.00 | 75% | |
Santa Clara | 21705 | SR 237/El Camino Real/Grant Road Intersection Improvements | $3.00 | $3.00 | $0.00 | $0.00 | 100% | |
Santa Clara | 21713 | SR 237 Westbound Auxiliary Lane between Coyote Creek Bridge and North First Street | $15.00 | $15.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 21714 | SR 25/Santa Teresa Boulevard/US 101 IC Construction (Includes US 101 Widening between Monterey Highway and SR 25) | $85.00 | $69.50 | $15.50 | $0.00 | 0% | |
Santa Clara | 21716 | SR 237 Widening for HOV Lanes between SR 85 and east of Mathilda Avenue | $36.00 | $36.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 21717 | SR 25 Upgrade to 6-Lane Facility Design | $10.00 | $10.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 21718 | SR 85 Auxiliary Lanes between Homestead Avenue and Fremont Avenue | $19.00 | $19.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 21719 | I-880/I-280/Stevens Creek Boulevard Interchange Improvements - Phase I | $14.00 | $14.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 21720 | US 101/Tennant Avenue Interchange Improvements in Morgan Hill | $10.00 | $10.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 21722 | US 101 Southbound Trimble Road/De La Cruz Boulevard/Central expressway Interchange Improvements | $27.00 | $27.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 21723 | US 101/Tully Road Interchange Modifications | $22.00 | $22.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 21724 | US 101 Auxiliary Lane Widening Between Trimble Raod to Montague Expressway | $10.00 | $10.00 | $0.00 | $0.00 | 0% | |
Sonoma | 21727 | Route 87/US 101 ramp connection to Trimble Road interchange | $28.00 | $0.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 21744 | Santa Clara Caltrain bike and pedestrian overcrossing for Intermodal Transit Center | $5.00 | $5.00 | $0.00 | $0.00 | 100% | |
Santa Clara | 21749 | Butterfield Blvd. Extension from Tennant Avenue to Watsonville Road | $14.03 | $14.03 | $0.00 | $0.00 | 0% | |
Santa Clara | 21754 | VTA Soundwall Program | $10.00 | $10.00 | $0.00 | $0.00 | 100% | Soundproofing of affected residences; not soundwalls |
Bay Area Region | 21762 | Caltrain electrification from San Francisco to Gilroy | $614.00 | 75% | SF to SJ only; duplicate of 21769 and 21627 | |||
Bay Area Region | 21769 | Caltrain electrification from San Francisco to Gilroy | $614.00 | 75% | SF to SJ only | |||
Santa Clara | 21785 | US 101/Blossom Hill Road Interchange Improvements | $7.00 | $0.00 | $0.00 | $0.00 | 0% | |
Solano | 21807 | I-80/680/12 Interchange Phase 2: widen I-80 from 8 lanes to 10 lanes (HOV) from I-680 to Air Base Parkway and reconstruct ramps on I-80 eastbound from SR 12 West to Green Valley Road (braid ramps) | $139.50 | $39.52 | $40.00 | $0.00 | 0% | |
Solano | 21809 | Match for improvements to local interchanges and arterials | $2.00 | $2.00 | $0.00 | $0.00 | 100% | |
Solano | 21823 | Operational and safety improvements on Route 12 from Sacramento River to I-80 (Phase 1) | $42.70 | $6.70 | $0.00 | $0.00 | 75% | Only if safety not capacity project |
Santa Clara | 21836 | San Tomas Expressway level-of-service improvements at Hamilton Avenue | $1.07 | $1.07 | 0% | |||
Sonoma | 21902 | Widen US 101 for HOV lanes: Old Redwood Hwy - Rohnert Park Expressway | $99.00 | $90.00 | 0% | |||
Alameda | 22002 | Extend HOV lane on NB I-880 from existing HOV terminus at Bay Bridge approach to Maritime on-ramp | $5.00 | $3.00 | $0.00 | $0.00 | 100% | |
Santa Clara | 22010 | I-280 Northbound - Second Exit Lane to Foothill Expressway | $1.00 | $1.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 22015 | I-680/I-880 Cross Connector Project Environmental and Conceptual Engineering | $7.00 | $7.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 22018 | Mathilda Avenue Interchange Improvements (Northbound US 101 and Westbound SR 237) | $13.00 | $13.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 22022 | Palo Alto Smart Residential Arterials | $6.22 | $5.00 | $0.00 | $0.00 | 100% | |
Alameda | 22038 | SFOBB Toll Plaza HOV Bypass Lanes | $4.00 | $4.00 | $0.00 | $0.00 | 100% | |
Alameda | 22042 | Route I-680 Northbound Corridor improvements including HOV/HOT lane, auxiliary lanes, and ramp metering. | $165.00 | $25.00 | $60.00 | $0.00 | 0% | |
Alameda | 22056 | Ashby BART Station - Ed Roberts Campus | $11.24 | $5.20 | $0.00 | $0.00 | 100% | |
Alameda | 22059 | Downtown Berkeley Transit Plaza | $5.00 | $5.00 | $0.00 | $0.00 | 100% | Must tie in with Telegraph Rapid Bus |
Alameda | 22062 | Construct element of future Irvington BART station | $2.40 | $2.40 | $0.00 | $0.00 | 0% | |
Alameda | 22064 | I-680 Sunol Grade SMART Carpool Lane | $20.00 | $10.00 | $0.00 | $0.00 | 100% | Sop to the road lobby and "Environmental" Defence; demonstration project; not widening |
Alameda | 22079 | West Oakland BART Transit Village | $30.00 | $25.00 | $0.00 | $30.00 | 33% | More private participation in both parking and buildings |
Alameda | 22080 | Oakland Citywide ITS - Phase 1 | $13.00 | $13.00 | $0.00 | $0.00 | 100% | |
Alameda | 22082 | Reconstruction of 7th St/UPRR Grade Separation | $93.75 | $0.00 | $75.00 | $0.00 | 100% | |
Alameda | 22084 | Air Cargo (Infield) Access Road | $10.40 | $7.70 | $0.00 | $0.00 | 0% | Port should fund |
Alameda | 22092 | Alameda County TOS & Ramp Metering from the City of Dublin to I-880, including I-238 | $2.60 | $2.60 | $0.00 | $0.00 | 100% | |
Alameda | 22100 | Davis Street/I-880 Overcrossing | $10.20 | $10.20 | $0.00 | $0.00 | 0% | |
Alameda | 22101 | Marina Blvd/I-880 Overcrossing | $8.00 | $3.00 | $0.00 | $0.00 | 0% | |
Alameda | 22110 | University Avenue Enhanced Bus Service | $5.00 | $5.00 | $0.00 | $0.00 | 100% | |
Santa Clara | 22118 | Hill Rd. Extension to Peet Ave. | $5.00 | $4.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 22121 | Loyola Drive Crossing at Foothill | $10.00 | $8.00 | $0.00 | $0.00 | 100% | |
San Mateo | 22125 | South San Francisco to San Francisco to Alameda Ferry Service | $22.20 | $6.00 | $0.00 | $10.20 | 0% | |
Santa Clara | 22134 | US 101 Southbound Widening from Story Road to Yerba Buena Road | $11.00 | $11.00 | $0.00 | $0.00 | 0% | |
San Francisco | 22135 | BART Station Capacity Projects | $959.88 | 67% | Should be Bay Area; | |||
Santa Clara | 22138 | US 101 Conversion to Four-Lane Freeway: SR 25 to Santa Clara/San Benito County Line | $140.00 | $0.00 | $140.00 | $0.00 | 100% | This is limited access freeway conversion safety project; not widening |
Santa Clara | 22140 | US 101 Widening between Cochrane Road and Monterey Highway | $164.00 | $0.00 | $164.00 | $0.00 | 0% | |
Santa Clara | 22142 | US 101/Capitol Expressway Interchange Improvements (Includes New NB On-ramp from Yerba Buena Rd) | $20.00 | $20.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 22145 | SR 237 Westbound to Northbound US 101 Connector Ramp and Auxiliary Lane Improvements | $8.00 | $8.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 22152 | Mathilda Caltrain Bridge Reconstruction | $17.42 | $3.50 | $0.00 | $0.00 | 100% | |
Santa Clara | 22153 | Mathilda /SR-237 Corridor Improvements (Mary Ave. Extension) | $50.00 | $0.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 22156 | SR 85 Northbound to Eastbound SR 237 Connector Ramp Improvement | $22.00 | $22.00 | $0.00 | $0.00 | 0% | |
Marin | 22157 | Park & Ride Lots for the support of Regional Express Bus service | $5.00 | $5.00 | $0.00 | $0.00 | 100% | |
Marin | 22159 | Marin County North Route 101 Ramp Meter, TOS, Fiber Optic Cable Project | $1.47 | $1.47 | $0.00 | $0.00 | 100% | |
Marin | 22160 | Marin County South Route 101 and I-580 Ramp Meter, TOS, Fiber Optic Cable Project | $1.83 | $1.83 | $0.00 | $0.00 | 100% | |
Santa Clara | 22162 | SR 237 Westbound to Southbound SR 85 Connector Ramp Improvements | $18.00 | $18.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 22164 | SR 237 Westbound On-Ramp at Middlefield Road | $8.00 | $8.00 | $0.00 | $0.00 | 100% | Whatever makes Michael and VTA happy |
Santa Clara | 22165 | US 101 Southbound to Eastbound SR 237 Auxiliary Lane Improvements -Phase I | $3.00 | $3.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 22168 | One-way Couplet Conversions at Various Intersections in San Jose | $20.00 | $16.00 | $0.00 | $0.00 | 100% | Assumes conversion TO two-way roads; 0% if conversion to one-way |
Santa Clara | 22169 | Coleman Avenue Widening to 6 lanes: Hedding - Autumn Street extension | $14.00 | $11.20 | $0.00 | $0.00 | 0% | |
Santa Clara | 22170 | Charcot Avenue Connection Project | $36.00 | $23.20 | $0.00 | $0.00 | 0% | |
Santa Clara | 22171 | Autumn Street Extension to Coleman Avenue with connector from I-880 | $10.00 | $8.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 22175 | Almaden Expressway Widening Between Coleman Road and Blossom Hill Road | $8.00 | $8.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 22176 | Berryessa Road Widening to 6 lanes from I-680 to Commercial Street. | $7.00 | $5.60 | $0.00 | $0.00 | 0% | |
Santa Clara | 22177 | Branham Lane Widening-Vista Park Drive to Snell Avenue | $8.22 | $3.90 | $0.00 | $0.00 | 0% | |
Santa Clara | 22178 | Calaveras Blvd. Overpass Widening | $40.00 | $32.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 22179 | Central Expressway Improvements between Lawrence Expressway and San Tomas Expressway: Widen from 4 to 6 lanes | $10.00 | $10.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 22180 | Central Expressway Widening between Lawrence Expressway and Mary Avenue to provide auxiliary acceleration and/or deceleration lanes | $13.00 | $13.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 22181 | Chynoweth Avenue Extension-East of Almaden | $15.00 | $6.30 | $0.00 | $0.00 | 0% | |
Santa Clara | 22182 | Gilman Rd - Arroyo Circle - Camino Arroyo Improvements | $7.01 | $5.60 | $0.00 | $0.00 | 0% | |
Santa Clara | 22183 | Lucretia Ave Widening-Story Rd to Phelan Ave. | $9.00 | $3.50 | $0.00 | $0.00 | 100% | If includes streetscape improvements; much growth programmed in area |
Santa Clara | 22185 | Oakland Road Widening | $10.00 | $3.70 | $0.00 | $0.00 | 100% | Sop to Santa Clara road widening projects |
Santa Clara | 22186 | San Tomas Expressway Improvements Between SR82 and Williams Road: widen to 8 lanes | $28.00 | $28.00 | $0.00 | $0.00 | 0% | |
San Mateo | 22223 | Study of US 101/Peninsula Avenue Southbound ramps. | $4.00 | $4.00 | $0.00 | $0.00 | 0% | |
San Mateo | 22226 | Study of Bayshore Intermodal Facility (Cross platform transfers with 3rd Street LRT at Caltrain Bayshore station and improve bus connection). | $4.00 | $4.00 | $0.00 | $0.00 | 100% | |
San Mateo | 22230 | Study of I-280 Auxiliary lanes from I-380 to Hickey. | $13.00 | $13.00 | $0.00 | $0.00 | 0% | |
San Mateo | 22236 | Study of Hillsdale Transit Center Relocation. | $3.00 | $3.00 | $0.00 | $0.00 | 100% | |
San Mateo | 22239 | Study of Manor Drive _ SR 1 Overcrossing Widening and Improvement Project. | $2.00 | $2.00 | $0.00 | $0.00 | 100% | |
Santa Clara | 22246 | Blossom Hill - Monterey Rd. Pedestrian Improvements | $6.80 | $5.40 | $0.00 | $0.00 | 100% | |
San Francisco | 22248 | Curb Ramps | $14.00 | $4.00 | $0.00 | $10.00 | 100% | |
San Mateo | 22261 | Route 1/San Pedro Creek Bridge Replacement Project - Iniital Phase | $6.20 | $1.00 | $0.00 | $0.00 | 100% | |
San Mateo | 22262 | US 101 North/92 Ramp Metering/TOS/Fiber Communications Project | $2.00 | $2.00 | $0.00 | $7.60 | 100% | |
San Mateo | 22264 | San Mateo County North I-280/380 Ramp Metering/TOS/Fiber Communications Project | $2.00 | $2.00 | $0.00 | $7.35 | 100% | |
San Mateo | 22265 | San Mateo County South I-280 and SR 92 Ramp Metering/TOS/Fiber Communications Project | $2.00 | $2.00 | $0.00 | $0.00 | 100% | |
San Mateo | 22268 | Countywide shuttle service programs | $68.00 | $8.00 | $0.00 | $60.00 | 100% | |
San Mateo | 22274 | Intelligent Transportation System (ITS) Improvements in San Mateo County. | $14.00 | $14.00 | $0.00 | 100% | ||
Santa Clara | 22422 | Senter Road Widening | $6.80 | $5.40 | $0.00 | $0.00 | 0% | |
San Francisco | 22423 | BART System Capacity Program | $1028.00 | 100% | This should be Bay Area Region; assumes this includes fleet replacement | |||
San Mateo | 22424 | BART Advanced Automatic Train Control Phase V - Daly City to Millbrae/SFO | $53.00 | $27.00 | $0.00 | $0.00 | 0% | worthless on modest-headway line |
San Francisco | 22426 | Islais Creek Maintenance Facility | $74.00 | $43.30 | 100% | |||
Alameda | 22455 | AC Transit BRT and Enhanced Bus: Telegraph/International BRT | $167.00 | $30.10 | $0.00 | $0.00 | 50% | Should be Rapid Bus (better than San Pablo) not BRT |
San Francisco | 22523 | BART Station Access Projects | $745.21 | 33% | Should be Bay Area; This should be bus+ped access NO PARKING | |||
Alameda | 22525 | BART Station Access Projects (Alameda County) | $14.50 | $9.50 | $0.00 | $0.00 | 0% | Rounding error in system-wide 22523 |
Alameda | 22527 | BART Station Capacity Projects: Alameda County Tier 1 | $42.10 | $42.10 | $0.00 | $0.00 | 0% | System-wide capacity assumed; rounding error in 22135 |
Contra Costa | 22602 | I-680 Auxiliary lane from Sycamore Valley Road to Crow Canyon Road in Danville | $36.50 | $20.00 | $0.00 | $0.00 | 0% | |
Contra Costa | 22603 | Richmond Intermodal Transfer Station - Parking Structure | $13.00 | $6.00 | $0.00 | $0.00 | 0% | |
Solano | 22634 | Vacaville Intermodal Station | $9.00 | $2.00 | $0.00 | $0.00 | 100% | |
Bay Area Region | 22635 | Sonoma Marin Area Rail Transit District | $0.00 | $0.00 | $0.00 | 100% | ||
Bay Area Region | 22636 | BART Transbay Tube Earthquake Safety Phase 1 | $156.00 | $0.00 | $0.00 | $0.00 | 100% | |
Contra Costa | 22637 | Pleasant Hill Crossover Project | $25.00 | $0.00 | $0.00 | $0.00 | 100% | Insanely expensive but useful |
San Mateo | 22649 | Campbell Avenue Bridge Widening over Los Gatos Creek | $1.50 | $1.50 | $0.00 | $0.00 | 100% | |
Alameda | 22657 | I-205/580 Altamont Westbound Truck Climbing Lane (was previously titled Ultimate I-205/580 Westbound Truck Bypass) | $78.00 | $0.00 | $58.00 | $20.00 | 0% | |
Solano | 22700 | I-80 North Connector: construct a parallel corridor north of I-80, beginning from Red Top Road to Abernathy Road, western section extends from the railroad crossing on Red Top Road to Business Center Drive | $68.00 | $30.30 | $0.00 | $0.00 | 0% | |
Solano | 22701 | I-80/680/12 Interchange Phases 3-4 (Truck Scales & Aux Lanes) | $350.00 | $20.00 | $30.00 | $250.00 | 0% | |
Solano | 22703 | I-80/680/780 Corridor Improvements (mid term projects except transit hubs and park and ride lots) | $444.35 | $30.00 | $56.35 | $350.00 | 0% | |
Solano | 22708 | Long term S.R. 12 Major Investment Study (MIS) capacity and operational improvements (I-80 to Sacramento Bridge) | $53.30 | $3.30 | $0.00 | $50.00 | 0% | |
San Mateo | 22720 | Caltrain Grade Separation Program (San Mateo County) | $107.00 | $107.00 | $0.00 | 100% | ||
San Mateo | 22721 | SamTrans Capital Replacement Program Shortfall | $20.00 | $20.00 | $0.00 | $60.00 | 100% | |
Alameda | 22760 | Outer Harbor Intermodal Terminal (formerly JIT Expansion) | $62.50 | $0.00 | $50.00 | $0.00 | 100% | |
Alameda | 22761 | I 880 North Improvements | $20.00 | $0.00 | $20.00 | $0.00 | 0% | |
Alameda | 22763 | I-880 & 5th Ave north and southbound ramp reconfiguration | $20.00 | $12.40 | $7.60 | $0.00 | 100% | Safety project |
Alameda | 22764 | I-880 Improvements - Hegenberger Rd. to 66th Ave. | $4.60 | $0.00 | $4.60 | $0.00 | 0% | |
Alameda | 22765 | HOV Direct Connector from WB I-580 to SB I-680 | $190.00 | $18.00 | $79.00 | $0.00 | 0% | |
Alameda | 22766 | Fruitvale Avenue Bridge Seismic Retrofit (Rail) | $7.20 | $1.40 | $0.00 | $0.00 | 0% | |
Alameda | 22768 | Estuary Bridges No Collapse Seismic Retrofit and Repairs | $2.40 | $1.00 | $0.00 | $0.00 | 100% | |
Alameda | 22769 | I-880 North Safety Improvements - 29th/Fruitvale area I-880 Access Imp. | $15.00 | $5.00 | $0.00 | $0.00 | 100% | More merging safety; Michael's mother's on-ramp |
Alameda | 22770 | City of Piedmont Signalization Project | $0.25 | $0.25 | $0.00 | $0.00 | 100% | |
Alameda | 22771 | Marin Avenue Reconfiguration Project. | $1.00 | $1.00 | $0.00 | $0.00 | 100% | |
Alameda | 22773 | Transit Capital Replacement, Local Road Rehabilitation and Safety Projects funded through the Measure B/Regional Bicycle-Pedestrian Set aside | $119.00 | $19.00 | $0.00 | $0.00 | 100% | |
Alameda | 22774 | Community Based Transportation Plan Bike & Pedestrian Improvements - unincorporated Hayward (Cherryland/Ashland) | $12.00 | $12.00 | $0.00 | $0.00 | 100% | |
Alameda | 22775 | Downtown Oakland Intermodal Transit Center Project | $10.60 | $1.60 | $0.00 | $0.00 | 100% | |
Alameda | 22776 | Route 84 Expressway Widening | $120.80 | $13.20 | $0.00 | $0.00 | 0% | |
Alameda | 22777 | I-580 Interchange Improvements in Castro Valley. | $25.20 | $13.00 | $0.00 | $0.00 | 0% | Sherman will define substitute project |
Alameda | 22778 | East Lewelling Roadway Improvements Project | $20.50 | $7.90 | $0.00 | $0.00 | 100% | Will aid BRT |
Alameda | 22779 | Route 262/Warren/I-880 Interchange Improvements, Phase 2: Warren Avenue/UPRR Grade Separation | $52.00 | $11.20 | $0.00 | $0.00 | 0% | |
Alameda | 22780 | AC Transit Major Corridor Enhancements: Macarthur/West Grand; College/University; Shattuck/Alameda; Foothill; Sacramento/Market; Mission/Outer E.14th; Hesperian | $97.00 | $7.00 | $0.00 | $0.00 | 100% | |
Alameda | 22781 | City of Albany Traffic Signals | $0.50 | $0.50 | $0.00 | $0.00 | 100% | |
Alameda | 22782 | Transit Oriented Development (including replacement parking) at MacArthur, West Oakland, and/or Coliseum BART Stations | $25.00 | $25.00 | $0.00 | $0.00 | 100% | Kill replacement parking; increase private participation; all 3 stations |
Alameda | 22783 | Fruitvale Avenue Roadway Bridge Seismic Retrofit | $22.80 | $11.20 | $0.00 | $0.00 | 100% | |
Alameda | 22785 | I-580 Eastbound Auxilliary Lane, First Street to Vasco Road | $2.00 | $0.00 | $0.00 | $0.00 | 0% | |
Alameda | 22786 | I-580 ramp metering in Livermore | $1.50 | $0.00 | $0.00 | $0.00 | 100% | |
Alameda | 22787 | Vallecitos Road/Isabel Avenue (Route 84) Intersection Realignment | $0.90 | $0.00 | $0.00 | $0.00 | 100% | |
Solano | 22794 | Curtola Transit Center | $12.00 | $6.00 | $0.00 | $0.00 | 100% | |
Solano | 22795 | Fairfield Transportation Center | $26.50 | $2.50 | $0.00 | $0.00 | 100% | |
Alameda | 22796 | I-580/Isabel Interchange Improvements Phase 1 and Phase 2 | $100.00 | $28.60 | $0.00 | $0.00 | 50% | HSR station for Amador Valley; provide access south ONLY on Isabel |
Santa Clara | 22805 | Dixon Landing Road Widening | $0.50 | $0.50 | $0.00 | $0.00 | 100% | |
Santa Clara | 22806 | Montague Expressway/Great Mall Parkway - Capitol Avenue Grade Separation | $40.00 | $17.50 | $0.00 | $0.00 | 0% | |
Santa Clara | 22807 | Additional Caltrain local station improvements | $87.20 | $87.20 | $0.00 | $0.00 | 100% | |
Santa Clara | 22808 | Caltrain Grade Separation Program (Santa Clara County) | $19.00 | $19.00 | $0.00 | 100% | ||
Santa Clara | 22809 | DeWitt Realignment with Sunnyside | $5.00 | $4.00 | $0.00 | $0.00 | 100% | |
Santa Clara | 22810 | Railroad Crossing Improvements - San Martin and Monterey | $1.20 | $0.50 | $0.00 | $0.00 | 100% | |
Santa Clara | 22811 | Railroad Crossing Improvements - Church at Monterey | $0.60 | $0.40 | $0.00 | $0.00 | 100% | |
Santa Clara | 22811 | Java Drive Bicycle Shared Use Improvements | $0.36 | $0.36 | $0.00 | $0.00 | 100% | |
Santa Clara | 22812 | Capitol Expressway Street Improvements | $2.00 | $2.00 | $0.00 | $0.00 | 100% | |
Santa Clara | 22813 | Wedgewood Avenue Improvements | $0.60 | $0.40 | $0.00 | $0.00 | 100% | |
Santa Clara | 22814 | Foothill Expressway at San Antonio | $0.50 | $0.50 | $0.00 | $0.00 | 100% | |
Santa Clara | 22815 | Miramonte Avenue Bikeway Improvements | $0.80 | $0.80 | $0.00 | $0.00 | 100% | |
Santa Clara | 22816 | Oregon Page-Mill Expressway: Corridor Improvements | $5.00 | $5.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 22817 | Campbell Avenue/SR 17 Street Improvements | $2.00 | $1.60 | $0.00 | $0.00 | 0% | |
Santa Clara | 22818 | Expressway and City Street Signals Coordination | $10.00 | $10.00 | $0.00 | $0.00 | 100% | |
Santa Clara | 22819 | Santa Teresa/Fitzgerald Intersection Improvements | $0.25 | $0.20 | $0.00 | $0.00 | 100% | |
Santa Clara | 22820 | Expressway Traffic Signal System Upgrade of Traffic Count Collection | $0.50 | $0.50 | $0.00 | $0.00 | 100% | |
Santa Clara | 22821 | Transportation, Livable Communities and Pedestrian Program | $37.40 | $37.40 | $0.00 | $0.00 | 100% | |
Santa Clara | 22822 | Expressway Traffic Information Outlets | $5.00 | $0.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 22823 | Snell Avenue Widening - Branham to Chynoweth | $2.80 | $2.80 | $0.00 | $0.00 | 0% | |
Santa Clara | 22826 | Rengstorff Avenue Grade Separation | $0.30 | $0.24 | $0.00 | $0.00 | 100% | |
Santa Clara | 22827 | Magdalena/Country Club Intersection Improvements | $0.35 | $0.30 | $0.00 | $0.00 | 100% | |
Santa Clara | 22828 | Dixon Landing Road/North Milpitas Boulevard Intersection Improvements | $1.00 | $0.80 | $0.00 | $0.00 | 100% | |
Santa Clara | 22829 | Fitzgerald and Masten Realignment at Monterey Road | $0.80 | $0.80 | $0.00 | $0.00 | 100% | |
Santa Clara | 22830 | First Street/SR 152 Roadway Widening | $1.16 | $0.90 | $0.00 | $0.00 | 0% | |
Santa Clara | 22831 | Expressway Signal Interconnect to Various Cities' Traffic Signal Systems | $2.50 | $2.50 | $0.00 | $0.00 | 100% | |
Santa Clara | 22832 | SR 152 Improvements, Traffic Signal at Gilroy Foods/WTI Intersection, SR 152 Widening from Miller's Slough through Llagas Creek Bridge | $10.00 | $10.00 | $0.00 | $0.00 | 100% | |
Santa Clara | 22833 | Almaden Expressway Interim Operational Improvements at SR 85 | $2.00 | $2.00 | $0.00 | $0.00 | 100% | |
Santa Clara | 22834 | SR 237 Eastbound Auxiliary Lane between Mathilda Avenue to Fair Oaks Avenue | $5.00 | $5.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 22835 | Sunnyvale Train Station North Side Access | $1.75 | $1.75 | $0.00 | $0.00 | 100% | |
Santa Clara | 22836 | Quito Road Improvements | $1.94 | $1.50 | $0.00 | $0.00 | 100% | |
Santa Clara | 22837 | Citywide Signal Upgrade Project Phase II | $0.50 | $0.40 | $0.00 | $0.00 | 100% | |
Santa Clara | 22838 | Lawrence Expressway: Prepare Caltrans PSR for project at Lawrence/Calvert/I-280 IC | $0.50 | $0.50 | $0.00 | $0.00 | 0% | |
Santa Clara | 22839 | Central Expressway HOV lane conversion | $0.10 | $0.10 | $0.00 | $0.00 | 0% | |
Santa Clara | 22840 | Almaden Expressway PSR/PDS to Reconfigure SR85/Almaden Expressway Interchange | $0.25 | $0.25 | $0.00 | $0.00 | 0% | |
Santa Clara | 22841 | Los Gatos Creek Trail (San Carlos St. to Guadalupe River) | $5.90 | $5.90 | $0.00 | $0.00 | 100% | |
Santa Clara | 22842 | SR 152 Improvements at Ferguson Road | $1.00 | $1.00 | $0.00 | $0.00 | 100% | |
Santa Clara | 22843 | Lawrence Expressway: Widen to 8 lanes between Moorpark/Bollinger and south of Calvert | $4.00 | $4.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 22844 | San Tomas Expressway at Monroe Street | $1.00 | $1.00 | $0.00 | $0.00 | 100% | |
Santa Clara | 22845 | US 101 Southbound Auxiliary Lane Improvement Between Ellis Street and SR 237 | $3.00 | $3.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 22846 | Stevens Creek Trail Reach 4 Central | $4.00 | $4.00 | $0.00 | $0.00 | 100% | |
Santa Clara | 22847 | Hwy 9 Bike Lanes | $1.70 | $1.70 | $0.00 | $0.00 | 100% | |
Santa Clara | 22848 | High Occupancy Toll Lane Demonstration Project Development | $2.00 | $2.00 | $0.00 | $0.00 | 100% | |
Santa Clara | 22849 | Los Gatos Creek Trail expansion on west side | $2.00 | $2.00 | $0.00 | $0.00 | 100% | |
Santa Clara | 22850 | Almaden Plaza Way Widening | $0.75 | $0.60 | $0.00 | $0.00 | 100% | |
Santa Clara | 22852 | Coyote Creek Trail (Hellyer County Park to Anderson Lake County Park) | $1.30 | $1.30 | $0.00 | $0.00 | 100% | |
Santa Clara | 22853 | Oregon Page-Mill Expressway: Alma Bridge Replacement Feasibility Study | $0.25 | $0.25 | $0.00 | $0.00 | 100% | |
Santa Clara | 22854 | Oregon Page-Mill Expressway: I-280/Page Mill Interchange Modification | $5.00 | $5.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 22855 | Coyote Creek Trail Connection | $0.51 | $0.51 | $0.00 | $0.00 | 100% | |
Santa Clara | 22856 | Lawrence Expressway-Saratoga Avenue Corridor Signal Optimization. | $0.10 | $0.10 | $0.00 | $0.00 | 100% | |
Santa Clara | 22857 | US 101 Southbound Auxiliary Lane Widening: I-880 to Mc Kee Road/Julian Street | $8.00 | $8.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 22858 | Union Avenue Widening Project | $1.72 | $1.40 | $0.00 | $0.00 | 100% | |
Santa Clara | 22859 | Berryessa Creek Trail (Reach 3) | $0.93 | $0.62 | $0.00 | $0.00 | 100% | |
Santa Clara | 22860 | California Avenue Undercrossing | $9.00 | $5.00 | $0.00 | $4.00 | 100% | |
Santa Clara | 22861 | Bicycle Boulevard/Lanes Network | $5.00 | $5.00 | $0.00 | $0.00 | 100% | |
Santa Clara | 22862 | Alum Rock School District Area Traffic Calming Elements | $2.00 | $1.60 | $0.00 | $0.00 | 100% | |
Santa Clara | 22863 | Borrgeas Ave. Bike Lanes (Weddell to Carribean) | $0.15 | $0.15 | $0.00 | $0.00 | 100% | |
Santa Clara | 22864 | Bollinger Rd. Bike Improvements | $0.44 | $0.27 | $0.00 | $0.00 | 100% | |
Santa Clara | 22865 | Coyote Creek Trail (Highway 237/Bay Trail toStory/Keyes | $6.10 | $6.10 | $0.00 | $0.00 | 100% | |
Santa Clara | 22866 | Lawrence Expressway & I-280 Interchange Area Signal Phasing and Timing Coordination | $0.10 | $0.10 | $0.00 | $0.00 | 100% | |
Santa Clara | 22867 | Rancho Rinconada Neighborhood Traffic Management Plan | $0.06 | $0.10 | $0.00 | $0.00 | 100% | |
Santa Clara | 22868 | Park Avenue Improvements | $1.00 | $0.80 | $0.00 | $0.00 | 100% | |
Santa Clara | 22869 | Guadalupe River Trail (Alviso- Hwy 880) | $5.10 | $5.10 | $0.00 | $0.00 | 100% | |
Santa Clara | 22870 | Uvas Creek Trail Extension - Study | $0.15 | $0.15 | $0.00 | $0.00 | 100% | |
Santa Clara | 22871 | Uvas Park Drive Roadway Extension | $2.22 | $1.80 | $0.00 | $0.00 | 100% | |
Santa Clara | 22872 | Montague Expressway HOV lane conversion | $0.10 | $0.10 | $0.00 | $0.00 | 0% | |
Santa Clara | 22873 | Foothill Expressway: Replace Loyola Bridge | $10.00 | $10.00 | $0.00 | $0.00 | 100% | |
Santa Clara | 22874 | Fremont Avenue Improvements at SR 85 | $2.00 | $2.00 | $0.00 | $0.00 | 100% | |
Santa Clara | 22875 | Campbell Avenue Bridge Widening over Los Gatos Creek | $1.50 | $1.50 | $0.00 | $0.00 | 100% | |
Santa Clara | 22876 | Lawerence Expressway HOV lane conversion to mixed flow between US 101 to Elko | $0.10 | $0.10 | $0.00 | $0.00 | 0% | |
Santa Clara | 22877 | Sunnyvale East Drainage Trail (JWC Greenway to Tasman Dr.) | $0.50 | $0.50 | $0.00 | $0.00 | 100% | |
Santa Clara | 22878 | Lawrence Expressway/Wildwood Avenue Roadway Realignment and Traffic Signal | $4.35 | $3.50 | $0.00 | $0.00 | 0% | |
Santa Clara | 22879 | Branham Lane/101 Pedestrian/Bike Overcrossing | $5.00 | $5.00 | $0.00 | $0.00 | 100% | |
Santa Clara | 22880 | Winchester Boulevard Streetscape Improvements | $4.03 | $0.80 | $0.00 | $0.00 | 100% | |
Santa Clara | 22881 | Lawrence Expressway/SR 237 Auxilary Lane Improvement | $3.00 | $3.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 22882 | ITS Enhancements on Bascom Avenue | $0.20 | $0.20 | $0.00 | $0.00 | 100% | |
Santa Clara | 22883 | Lawrence Expressway limited access closures | $0.50 | $0.50 | $0.00 | $0.00 | 0% | |
Santa Clara | 22884 | Evelyn Ave. Bike Lanes (Sunnyvale Ave to Reed Ave) | $0.36 | $0.36 | $0.00 | $0.00 | 100% | |
Santa Clara | 22885 | Los Gatos Creek Trail expansion on west side | $2.00 | $2.00 | $0.00 | $0.00 | 100% | |
Santa Clara | 22886 | McKean Rd.shoulder widening and treatments. | $5.00 | $5.00 | $0.00 | $0.00 | 100% | |
Santa Clara | 22887 | Moody Road Improvements | $0.24 | $0.20 | $0.00 | $0.00 | 100% | |
Santa Clara | 22888 | King Road Pedestrian Improvements at Barberry | $1.00 | $0.80 | $0.00 | $0.00 | 100% | |
Santa Clara | 22889 | Stevens Creek Trail Reach 4 South | $5.00 | $5.00 | $0.00 | $0.00 | 100% | |
Santa Clara | 22890 | Adobe Creek Bike/Pedestrian Bridge Replacement | $0.49 | $0.49 | $0.00 | $0.00 | 100% | |
Santa Clara | 22891 | Alamden Expressway Pedestrian/Bike Overcrossing | $5.70 | $5.70 | $0.00 | $0.00 | 100% | |
Santa Clara | 22892 | US 101 Southbound Auxiliary Lane between Great America Parkway to Lawrence Expressway | $2.00 | $2.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 22893 | US 101 Northbound Auxiliary Lane Widening: I-880 to Mc Kee Road/Julian Street | $9.00 | $9.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 22894 | US 101 Mabury Road/Taylor Street Interchange Environmental and Preliminary Engineering | $2.00 | $2.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 22895 | San Tomas Expressway At-Grade Improvements at SR 17/San Tomas | $2.00 | $2.00 | $0.00 | $0.00 | 0% | |
Santa Clara | 22896 | Coyote Creek Trail (Reach 1) | $1.20 | $0.62 | $0.00 | $0.00 | 100% | |
Santa Clara | 22897 | I-680 HOV Lane: Calaveras Boulevard to SR 84 | $25.00 | $25.00 | $0.00 | $0.00 | 0% | |
San Mateo | 22900 | Additional Caltrain local station capital improvements | $29.15 | $29.15 | $0.00 | $0.00 | 100% | |
Santa Clara | 22903 | VTA Pavement Management Program - Non MTS Shortfall | $100.00 | $100.00 | $0.00 | $0.00 | 100% | |
Santa Clara | 22979 | US 101/Zanker Road/Skyport Drive/Fourth Street Interchange Environmental and Preliminary Engineering | $5.00 | $5.00 | $0.00 | $0.00 | 100% | HSR station and SJC access |
Alameda | 94012 | UNION CITY INTERMODAL STATION, PHASE 1 | $33.90 | $7.10 | $0.00 | $0.00 | 100% | |
Contra Costa | 94045 | New express buses for I-80 HOV service (capital costs) | $16.90 | $16.90 | $0.00 | $0.00 | 100% | |
Contra Costa | 94046 | Non-capacity increasing improvements to interchanges and parallel arterials to Route 4 | $9.10 | $9.10 | $0.00 | $0.00 | 100% | Note: ONLY for parallel roads (eg San Pablo); not for I80 itself |
Contra Costa | 94048 | Non-capacity increasing improvements to interchanges and parallel arterials to I-80 | $12.30 | $12.30 | $0.00 | $0.00 | 100% | Note: ONLY for parallel roads (eg San Pablo); not for I80 itself |
Contra Costa | 94050 | Upgrade Route 4 to full freeway from I-80 to Cummings Skyway (Phase 2) | $50.00 | $50.00 | $0.00 | $0.00 | 100% | Safety project and sop to Caltrans |
Marin | 94055 | Metropolitan Transportation System (MTS) streets and roads pavement rehabilitation shortfall (see Committed projects) | $11.60 | $0.00 | $0.00 | $0.00 | 100% | |
Napa | 94073 | Route 12/29/221 (Soscol Avenue) intersection improvements | $20.00 | $11.00 | $7.00 | $0.00 | 100% | |
Napa | 94074 | Widen SR 12 (Jamieson Canyon) to 4 Lanes | $104.00 | $29.20 | $17.80 | $0.00 | 0% | |
Napa | 94075 | SR 12/29/Airport Interchange | $39.90 | $16.30 | $21.10 | $0.00 | 0% | |
San Francisco | 94089 | South Acess to the Golden Gate Bridge Replacement: Doyle Drive | $446.70 | $316.20 | 100% | |||
Solano | 94139 | Non-MTS streets and roads pavement maintenance shortfall | $561.64 | $41.00 | $0.00 | $210.00 | 100% | |
Solano | 94148 | Construct rail stations and track improvements for Amtrak Capitol Corridor service | $40.00 | $10.00 | $0.00 | $0.00 | 100% | |
Solano | 94151 | Jepson Parkway (Remaining improvements to fully fund and construct segments) | $70.40 | $43.00 | $0.00 | $0.00 | 0% | |
Solano | 94152 | Widen Route 12 (Jameson Canyon) from I-80 in Solano County to Route 29 in Napa County from 2 lanes to 4 lanes (Solano County portion of project) | $51.05 | $31.20 | $17.80 | $0.00 | 0% | |
Solano | 94153 | Non-capacity increasing safety projects to improve congested intersections, local arterials and highways | $28.00 | $3.00 | $0.00 | $25.00 | 100% | |
Santa Clara | 98103 | SR 17 Improvements, NB SR 17 Auxiliary Lane from Camden Avenue to Hamilton Avenue | $12.00 | $12.00 | $0.00 | $0.00 | 0% | |
Contra Costa | 98126 | Non-capacity increasing improvements to interchanges and parallel arterials to I-680 and Route 24 | $9.10 | $9.10 | $0.00 | $0.00 | 100% | Note: ONLY for parallel roads (eg San Pablo); not for I80 itself |
Contra Costa | 98130 | Widen Alhambra Avenue from Route 4 to McAlvey Drive (Phases 2 and 3) | $14.60 | $8.60 | $0.00 | $0.00 | 0% | |
Contra Costa | 98133 | Widen Pacheco Boulevard from 2 lanes to 4 lanes from Blum Road to Arthur Road | $15.00 | $6.50 | $0.00 | $0.00 | 100% | Needed for Central CoCo Rapid bus |
Alameda | 98139 | ACE station/track improvements in Alameda County, includes parking improvements at Vasco Road and downtown Livermore stations | $20.10 | $2.00 | $1.00 | $0.00 | 0% | CHSRA |
onoma | 98147 | Widen US 101 (adding an HOV lane in each direction) from Marin County line north to Old Redwood Highway in Petaluma | $200.00 | $28.00 | $113.00 | $0.00 | 0% | |
Marin | 98154 | Widen US 101 from 4 lanes to 6 lanes (including 2 HOV lanes) from Route 37 to the Sonoma County line and convert some portions from expressway to freeway | $200.00 | $30.00 | $111.00 | $0.00 | 0% | |
Contra Costa | 98157 | Enhancements to AC Transit bus service for the San Pablo corridor in Contra Costa County | $8.50 | $8.50 | $0.00 | $0.00 | 100% | |
Solano | 98168 | Solano County intercity bus service and transit hubs (capital costs) | $108.00 | $5.00 | $0.00 | $83.00 | 100% | |
Santa Clara | 98175 | Widen Montague Expressway from 6 lanes to 8 lanes (adds two mixed flow lanes) from I-680 to US 101 | $26.40 | $26.40 | 0% | |||
Marin | 98179 | US 101/TiburonBoulevard interchange improvements: widen southbound offramp | $12.69 | $4.96 | $0.00 | 0% | ||
Sonoma | 98183 | Widen for US 101 HOV lanes: Steele Lane - Windsor River Rd | $100.00 | $62.00 | $20.00 | $0.00 | 0% | |
Contra Costa | 98194 | Extend Commerce Avenue to Willow Pass Road | $6.20 | $1.70 | $0.00 | $0.00 | 0% | Assume developer will pay |
Contra Costa | 98196 | Route 24 eastbound auxiliary lanes from Gateway Boulevard to Brookwood Road/Moraga Way in Orinda | $6.80 | $5.80 | $0.00 | $0.00 | 0% | |
Contra Costa | 98198 | Vasco Road safety and operational improvements in Contra Costa and Alameda Counties. | $18.00 | $3.00 | $0.00 | $0.00 | 50% | Assumes just safety improvements |
San Mateo | 98203 | Study of Route 1 in Half Moon Bay area operational and safety improvements | $4.00 | $4.00 | $0.00 | $0.00 | 100% | |
Alameda | 98207 | I-880/Broadway-Jackson interchange improvements (Phase 1) | $28.00 | $17.20 | $0.00 | $0.00 | 100% | Additional off-ramp for downtown Oakland |
Alameda | 98208 | Soundwalls | $10.00 | $10.00 | $0.00 | $0.00 | 0% | |
Solano | 98212 | Local bicycle and pedestrian projects | $21.80 | $2.30 | $0.00 | $0.00 | 100% | |
Contra Costa | 98222 | Route 4 Bypass, Segment 1: Route 160 freeway-to-freeway connectors to and from the north | $23.00 | $17.00 | $0.00 | $21.00 | 0% | |
Solano | 98509 | Local Streets and Roads non-pavement shortfall. | $330.38 | $1.00 | $0.00 | $210.00 | 100% | |
Marin | 98525 | Seismic retrofit and upgrade (rehabilitation) of local bridges and overpasses shortfall. | $4.03 | $4.03 | $0.00 | 100% | ||
Marin | 98551 | Transportation for Livable Communities - county program | $5.00 | $0.00 | $0.00 | $0.00 | 100% | |
Marin | 98560 | Surface Transportation Program planning funds for the county | $1.60 | $0.00 | $0.00 | $0.00 | 100% | |
Contra Costa | 98999 | Widen Route 4 East from 4 lanes to 8 lanes from Somersville Road to SR160 | $232.00 | $28.40 | $100.00 | $0.00 | 0% | |
Alameda | AN-1 | Phase 1B of the overall project to reconstruct I-880/Route 262 interchange and widen I-880 from Route 262(Mission Boulevard) to the Santa Clara County line from 8 to 10 lanes. | $38.30 | $26.00 | $0.00 | $0.00 | 0% | |
Alameda | AN-2 | Route I-680 Northbound and Southbound Corridor improvements including HOV/HOT lane, auxiliary lanes, and ramp metering. | $223.00 | $0.00 | $0.00 | $0.00 | 0% |